EXPLOITATIONS MINIERES

In the mines underground of Kamoto, the new method of exploitation by "sublevel caving", offer a bigger suppleness of exploitation, a big security and of the advanced mechanization possibilities. If shovels to the pot of 11 m³ and the skips of 100 tons are already since some times in service in our careers, today of heavy contraptions on caterpillars or on tires made their apparition in our exploitations undergrounds.

Jumbo drilling machine

Auto-chargeuse with pot of 150 liters.

Mining undergroung

The exploitation of a layer by underground mine is considered when the depth of the lodging mineralized under the level of soil is in the open as an exploitation is not profitable or rest of the being, seen the importance of the works of starting to agreeing. The methods of exploitation in underground are chosen of factors as the heap to exploit, the holding of the épontes, the wealth of the minéralisation, the possibilities to mechanize the exploitation, etc...

The Mine Prince Léopold in Kipushi is our most former underground mine. She/it has a capacity of extraction of 1.040.000 t of ores currently per year. In 1969, the exploitation descended below the level -700 meters. Important works are undertaken, including the fonçage of a new well in order to push this exploitation until 1.000 meters of depth, and later beyond. The main method of exploitation used in Kipushi is the "bip slicing" (slices thunderstruck unidescendantes). In some yards, one uses the "sublevel stoping" (cut down sublevel) and the "shrinkage stoping" (room stores). The underground mine of Kambove can be considered like a pilot mine because one finalized a new method of exploitation there by "sublevel caving" (struck sublevel) that replaced the "bip slicing" used in the beginnings. She/it offers a bigger suppleness of exploitation, a big security and of the advanced mechanization possibilities. We used there for example for the first time of the contraptions on tires. The capacity of extraction of the mine of Kambove will reach 1.200.000 tons per year in 1972.

It is this same method that will be applied in the new underground mine of Kamoto, from 1970. This mine is going to continue the exploitation of the layer when the career of main Kamoto will have reached his/her/its depth limit

The mechanization of the yard operations by autonomous contraptions of boring, loading and transportation, already achieved for a part of the preparatory works, will be there complete at the time of the setting in exploitation. The mine of Kamoto is joined to the bottom of the career by two tilted road access that will allow the first stage of the exploitation to go back up in surface by means of skips of 25 tons ores extracted in underground. The capacity of extraction of the mine of Kamoto will pass 3.000.000 tons of ores per year in 1976.

A Jumbo, drilling machine to multiple foils, in a gallery of the mine of Kamoto.

Concentration of ores continue ->>